Built for: Developers, investors, and project teams screening early MEP risk
Use this to flag likely utility capacity and connection risks before you rely on the site in an appraisal or early feasibility decision.
D-UV-001
Audience: 🏗️ Developers & Design Teams | D-UV-001 | Legacy Business Engineers Ltd | legacybe.ie
📊 See what an S1 Deal Viability Memo delivers — Kestrel House sampleView Sample →
Utilities Viability Check
D-UV-001 v1.16.0 | Desktop Utility Assessment for Development Sites
LegacyBE legacybe.ie
๐๏ธ Project Details
โก Electrical Context
TGD Part L requires EV provision on new builds
๐ง Existing Utilities (if known)
Check all that apply:
๐ Utilities Viability Assessment โ
Indicative screening result only โ for early appraisal and feasibility review, not design sign-off, utility confirmation, or statutory compliance.
What this tool can't tell you:This tool uses desktop assessment. It can't confirm actual network capacity. An S1 Deal Viability Memo includes utility capacity screening with ESB/IW/GNI risk assessment โ helping you decide whether utilities risk is likely to undermine the deal.
Commission an S1 Deal Viability Memo โ
S1 ยท From โฌ2,500 + VAT ยท Professional sign-off included
โ ๏ธ IMPORTANT
This tool provides indicative guidance only. It does not constitute professional advice, a formal assessment, or a compliance check. All outputs should be verified by a qualified MEP engineer before use in any decision-making process. Utility availability, capacity, and connection costs should be confirmed directly with each utility provider.
๐
Got the answers? Here's what to do next
This tool provides screening-level guidance. For a professional assessment with chartered engineer sign-off, detailed costings, and a client-ready report โ send us what you have. We'll confirm scope and fee within 4 hours.
S1 Deal Viability Memo | Early decision support | From โฌ2,500 + VAT